|
1:施工中的节制闸(A controlling
gate under construction)
2:混凝土护坡的总干渠明渠
(The open canal of the General Arterial Canal whose slope
is protect by concrete)
3:工人细读施工图(Workers were reading construction drawing
carefully)
4:涪梓干渠上段的土佛斗渠渡槽(The aqueduct on the Tufo Trunk Ditch of
the upper section of Fuzi Arterial Canal)
5:高高分支渠上的渡槽群(The aqueduct group on the Gaogao Sub-branch
Canal)
6:石龙嘴电站(Shilongzui Hydropower Station)
|
7:射洪县复兴县红庙垭渡槽
(Hongmiaoya Aqueduct in Fuxing Town of Shehong Conunty)
8:电站焊接施工(Soldering at the power station)
9:1997年3月18日,武引沉抗水库奠基典礼隆重举行,国家计委、水利部及省市领导为水库奠基
|
|